toolkit/sync
2022-11-10 13:14:49 -07:00
..
common hardlinking should be post-sync to prod before file list 2022-07-15 16:05:14 -07:00
common_8 general sync script cleanup 2022-11-10 11:56:09 -07:00
common_9 fix readme and bump to RC2 2022-07-04 13:10:48 -07:00
gen-torrents.sh Run / source sync things from other directories 2022-07-13 01:56:04 -04:00
minor-release-sync-to-staging.sh do ISO work in the compose before pushing 2022-11-10 13:14:49 -07:00
prep-staging-8.sh finish wrapper, start repoclosure 2022-05-25 21:39:32 -07:00
propagate-image.sh make regex take care of double digits 2022-10-12 20:39:23 -07:00
README.md update readme 2021-07-21 11:55:21 -07:00
sign-repos-only.sh kickstart 2021-09-14 08:52:12 -07:00
stage-live-images.sh remove unused var 2021-11-10 12:37:28 -07:00
symlink-images-and-checksum.sh begin ISO magic 2022-05-19 00:48:07 -07:00
sync-file-list-parallel.sh further parallelize 2022-07-18 15:40:46 -07:00
sync-full-file-list.sh just in case, use full path for bg processes 2022-07-18 08:33:24 -07:00
sync-root-file-list.sh just in case, use full path for bg processes 2022-07-18 08:33:24 -07:00
sync-sig-file-list.sh generating the list in the wrong place 2022-07-31 20:40:05 -07:00
sync-to-prod-9.sh hardlinking should be post-sync to prod before file list 2022-07-15 16:05:14 -07:00
sync-to-prod-sig.sh add sig syncs 2022-07-25 18:03:07 -07:00
sync-to-prod.delete.sh general sync script cleanup 2022-11-10 11:56:09 -07:00
sync-to-prod.sh hardlinking should be post-sync to prod before file list 2022-07-15 16:05:14 -07:00
sync-to-staging-9.sh move generate confs and add testing script 2022-07-15 10:39:35 -07:00
sync-to-staging-fpsync-testing.sh move generate confs and add testing script 2022-07-15 10:39:35 -07:00
sync-to-staging-sig.sh reduce required arguments 2022-07-31 19:27:46 -07:00
sync-to-staging.delete.sh general sync script cleanup 2022-11-10 11:56:09 -07:00
sync-to-staging.sh general sync script cleanup 2022-11-10 11:56:09 -07:00
test.sh fixes 2021-07-07 19:58:50 -07:00

sync

These scripts assist in syncing to staging and to prod for releases, whether they are full point releases, simple update releases, or a brand new repository being added. Each script here has a specific purpose.

What to do?

When the scripts are being ran, they are usually ran with a specific purpose or a reason. They are also ran in a certain order.

The below are common vars files. common_X will override what's in common.

.
├── common
├── common_8

These are for the releases in general. What they do is noted below.

├── gen-torrents.sh                  -> Generates torrents for images
├── minor-release-sync-to-staging.sh -> Syncs a minor release to staging
├── prep-staging-8.sh                -> Preps staging updates and signs repos
├── sign-repos-only.sh               -> Signs the repomd (only)
├── sync-to-prod.sh                  -> Syncs staging to production
├── sync-to-staging.sh               -> Syncs a provided compose to staging
├── sync-to-staging-sig.sh           -> Syncs a sig provided compose to staging

Generally, you will only run minor-release-sync-to-staging.sh when a full minor release is being produced. So for example, if 8.5 has been built out, you would run that after a compose. gen-torrents.sh would be ran shortly after.

When doing updates, the order of operations (preferably) would be:

  • sync-to-staging.sh
  • sync-to-staging-sig.sh Only if sigs are updated
  • prep-staging-X.sh -> This is required to ensure the groups, compos, and module data stay sane. This helps us provide older packages in the repos.
  • sync-to-prod.sh -> After the initial testing, it is sent to prod.