remove prep-staging

This commit is contained in:
Louis Abel 2023-05-17 16:33:36 -07:00
parent b2195d1426
commit be63021584
Signed by: label
GPG Key ID: B37E62D143879B36

View File

@ -89,7 +89,6 @@ These are for the releases in general. What they do is noted below.
``` ```
├── gen-torrents.sh -> Generates torrents for images ├── gen-torrents.sh -> Generates torrents for images
├── minor-release-sync-to-staging.sh -> Syncs a minor release to staging ├── minor-release-sync-to-staging.sh -> Syncs a minor release to staging
├── prep-staging-X.sh -> Preps staging updates and signs repos
├── sign-repos-only.sh -> Signs the repomd (only) ├── sign-repos-only.sh -> Signs the repomd (only)
├── sync-to-prod.sh -> Syncs staging to production ├── sync-to-prod.sh -> Syncs staging to production
├── sync-to-staging.sh -> Syncs a provided compose to staging ├── sync-to-staging.sh -> Syncs a provided compose to staging
@ -103,9 +102,6 @@ When doing updates, the order of operations (preferably) would be:
``` ```
* sync-to-staging.sh * sync-to-staging.sh
* sync-to-staging-sig.sh -> Only if sigs are updated * sync-to-staging-sig.sh -> Only if sigs are updated
* prep-staging-8.sh` -> This is required to ensure the groups, comps, and
module data stay sane. This helps us provide older
packages in the repos as well as signs repo metadata.
* sync-to-prod.sh -> After the initial testing, it is sent to prod. * sync-to-prod.sh -> After the initial testing, it is sent to prod.
``` ```
@ -117,7 +113,6 @@ RLVER=8 bash sync-to-staging.sh Plus
RLVER=8 bash sync-to-staging.sh Extras RLVER=8 bash sync-to-staging.sh Extras
RLVER=8 bash sync-to-staging.sh Rocky-devel RLVER=8 bash sync-to-staging.sh Rocky-devel
RLVER=8 bash sync-to-staging.sh Rocky RLVER=8 bash sync-to-staging.sh Rocky
bash prep-staging-8.sh
``` ```
Once the syncs are done, staging must be tested and vetted before being sent to production. During this stage, the `updateinfo.xml` is also applied where necessary to the repositories to provide errata. Once staging is completed, it is synced to production. Once the syncs are done, staging must be tested and vetted before being sent to production. During this stage, the `updateinfo.xml` is also applied where necessary to the repositories to provide errata. Once staging is completed, it is synced to production.