[SIG] Requests for SIG Proposal: HPC #10

Closed
opened 2023-05-02 13:24:08 +00:00 by sherif · 1 comment
Owner

Introduction

I am Sherif and I requesting resources for the Special Interest Group HPC.

Initial Project

This SIG will be aiming to provide HPC related package and optimization of current RockyLinux packages to meet the SIG's needs such as, those are just examples:

  • Slurm
  • ohpc
  • Apptainer
  • warewulf

Also we will be producing wiki pages and documents which we would like to be mainlined with current RockyLinux wiki and documetnation direction.

Initial Asks

Check your initial requests for this SIG. Defaults are filled in.

  • Groups in Rocky Account Services
  • RESF Git Service Organization
  • Channel in Mattermost
  • Mail List
  • Bridge Mattermost Channel to IRC and Matrix
  • Rocky Linux GitLab groups

Checklist

  • I have read the Special Interest Group Guide
  • I have put in the initial proposal at the appropriate venue (such as mattermost)
  • I acknowledge that I may be sponsoring this Special Interest Group
## Introduction I am Sherif and I requesting resources for the Special Interest Group HPC. ## Initial Project This SIG will be aiming to provide HPC related package and optimization of current RockyLinux packages to meet the SIG's needs such as, those are just examples: - Slurm - ohpc - Apptainer - warewulf Also we will be producing wiki pages and documents which we would like to be mainlined with current RockyLinux wiki and documetnation direction. ## Initial Asks Check your initial requests for this SIG. Defaults are filled in. - [x] Groups in Rocky Account Services - [x] RESF Git Service Organization - [x] Channel in Mattermost - [x] Mail List - [x] Bridge Mattermost Channel to IRC and Matrix - [x] Rocky Linux GitLab groups ## Checklist - [x] I have read the [Special Interest Group Guide](https://wiki.rockylinux.org/special_interest_groups/sig_guide/) - [x] I have put in the initial proposal at the appropriate venue (such as mattermost) - [x] I acknowledge that I may be sponsoring this Special Interest Group
sherif added the
SIG_Proposal
label 2023-05-02 13:24:08 +00:00
Owner

Closing as completed!

Closing as completed!
neil closed this issue 2023-07-24 16:20:12 +00:00
Sign in to join this conversation.
No Milestone
No project
No Assignees
2 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: sig_core/meta#10
No description provided.