* Get a list of packages from Jeremy to pick up from openHPC
* Greg / Sherif talk in Rocky / RESF about generic SIG for common packages such as chaintools
* Plan the openHPC demo Chris / Sherif
* Finlise the slurm package with naming / configuration
## Old business:
## 2023-05-18:
* Get a demo / technical talk after 4 weeks "Sherif can arrange that with Chris"
* Getting a list of packages that openHPC would like to move to distros "Jeremy will be point of contact if we need those in couple of weeks"
## 2023-05-04
* Start building slurm - On going , a bit slowing down with R9.2 and R8.8 releases, however packages are built, some minor configurations needs to be fixed -
* Start building apptainer - on hold -
* Start building singulartiry - on hold -
* Start building warewulf - on hold -
* Sherif: check about forums - done, we can have our own section if we want, can be discussed over the chat -
## 2023-04-20
* Reach out to other communities “Greg” - on going -
* Reaching out for different sites that uses Rocky for HPC “Stack will ping few of them and others as well -Group effort-”
* Reaching out to hardware vendors - nothing done yet -
* Statistic / public registry for sites / HPC to add themselves if they want - nothing done yet -