Summary:
I really just want to add the desktop_terminal test, but I think
this refactor is in order now. It splits up loading of the
various test phases (much as SUSE do it) and allows us to run
the post-install tests without the install tests, for e.g. I
tweaked things to allow the upgrade tests to use the existing
_wait_login tests for final login and combine the two upgrade
postinstall tests into one simple one.
This comes with a bit of a behaviour change to make graphical
wait login behave the same as console wait login: it will log
in unless USER_LOGIN is set to 'false'. Previously it only
logged in if both USER_LOGIN and USER_PASSWORD were set, which
I don't think ever happened in a graphical test, so we never
actually did a graphical login. The intent here is we should do
a login on the default_install tests. That's going a bit beyond
the test case, but it seems like a reasonable thing to test. We
can set USER_LOGIN to false if we don't want to do it.
Test Plan:
Do a full test run, make sure the new tests work and
no old tests break.
Reviewers: jskladan, garretraziel
Reviewed By: garretraziel
Subscribers: tflink
Differential Revision: https://phab.qadevel.cloud.fedoraproject.org/D839
Summary:
you can't use validate_script_output like this, it doesn't just
return a bool, it actually kills the test if the output doesn't
validate. So any time we didn't have anything in /var/tmp/abrt,
the post_fail_hook would die at that point and not upload the
contents of /var/log as we wanted it to.
Note that even script_output will kill the test if the return
code is >0. That's OK in this case, but always be careful with
these subroutines.
Test Plan:
Run a test that fails in post-install but doesn't
produce anything in /var/tmp/abrt (you may have to artificially
break something). Check that it now uploads /var/log. I noticed
this while working on FreeIPA tests...
Reviewers: jskladan, garretraziel
Reviewed By: garretraziel
Subscribers: tflink
Differential Revision: https://phab.qadevel.cloud.fedoraproject.org/D830
Summary:
This is a first cut which more or less works for now. Issues:
1) We're not really testing the BUILD, here. All the test does
is try and upgrade to the specified VERSION - so it'll be using
the latest 'stable' for the given VERSION at the time the test
runs. This isn't really that terrible, but especially for TC/RC
validation, we might want to make things a bit more elaborate
and set up the repo for the actual BUILD (and disable the main
repos).
2) We'd actually need --nogpgcheck for non-Rawhide, at one
specific point in the release cycle - after Branching but
before Bodhi activation (which is when we can be sure all
packages are signed). This won't matter until 24 branches, and
maybe releng will have it fixed by then...if not, I'll tweak
it.
3) We don't really test that the upgrade actually *happened*
for desktop, at the moment - the only thing in the old test
that really checked that was where we checked for the fedup
boot menu entry, but that has no analog in dnf. What we should
probably do is check that GUI login works, then switch to a
console and check /etc/fedora-release just as the minimal test
does.
Test Plan:
Run the tests. Note that creating the desktop disk
image doesn't work ATM, so I can't verify the desktop test
works, but the minimal one seems to (with D565). There'll be
a matching diff for openqa_fedora_tools to update the test
case names there.
Reviewers: jskladan, garretraziel
Reviewed By: jskladan, garretraziel
Subscribers: tflink
Differential Revision: https://phab.qadevel.cloud.fedoraproject.org/D567