Adding inter server tests #148

Merged
tcooper merged 18 commits from develop into main 2023-02-09 17:24:58 +00:00
tcooper commented 2023-02-08 04:41:09 +00:00 (Migrated from github.com)
No description provided.
AlanMarshall (Migrated from github.com) approved these changes 2023-02-08 17:36:52 +00:00
AlanMarshall (Migrated from github.com) left a comment

The commits in this PR#148 are the same as those merged to branch develop by PR#74 and comments therein apply.
I repeated the tests from PR#74 here using branch develop with identical results.

The commits in this PR#148 are the same as those merged to branch develop by PR#74 and comments therein apply. I repeated the tests from PR#74 here using branch develop with identical results.
lumarel (Migrated from github.com) approved these changes 2023-02-09 15:50:55 +00:00
lumarel (Migrated from github.com) left a comment

Still LGTM 👌🏻
Only signing 🙄

Still LGTM 👌🏻 Only signing 🙄
tcooper commented 2023-02-09 17:22:55 +00:00 (Migrated from github.com)

I see all commits signed in the original PR so the apparent signature removal must come from the way the merge to develop was done. I'll have to read up on how to not do that in the future. I'm going to remove the all-commit-signed branch protection flag, merge this PR and restore the flag.

I see all commits signed in the [original PR](https://github.com/rocky-linux/os-autoinst-distri-rocky/pull/74/commits) so the apparent signature removal must come from the way the merge to `develop` was done. I'll have to read up on how to not do that in the future. I'm going to remove the all-commit-signed branch protection flag, merge this PR and restore the flag.
Sign in to join this conversation.
No Milestone
No project
No Assignees
1 Participants
Notifications
Due Date
The due date is invalid or out of range. Please use the format 'yyyy-mm-dd'.

No due date set.

Dependencies

No dependencies set.

Reference: testing/os-autoinst-distri-rocky-migrated#148
No description provided.