mirror of
https://git.resf.org/sig_core/wiki.git
synced 2024-11-16 12:31:22 +00:00
140 lines
3.9 KiB
Markdown
140 lines
3.9 KiB
Markdown
---
|
|
title: Rocky Release Procedures for SIG/Core (RelEng/Infrastructure)
|
|
---
|
|
|
|
This SOP contains all the steps required by SIG/Core (a mix of Release
|
|
Engineering and Infrastructure) to perform releases of all Rocky Linux
|
|
versions. Work is in all collaboration within the entire group of
|
|
engineerings.
|
|
|
|
## Contact Information
|
|
|
|
| | |
|
|
| - | - |
|
|
| **Owner** | SIG/Core (Release Engineering & Infrastructure) |
|
|
| **Email Contact** | infrastructure@rockylinux.org |
|
|
| **Email Contact** | releng@rockylinux.org |
|
|
| **Mattermost Contacts** | `@label` `@neil` `@tgo` `@skip77` `@mustafa` `@sherif` `@pgreco` |
|
|
| **Mattermost Channels** | `~Infrastructure` |
|
|
|
|
## Preparation
|
|
|
|
## Notes about Release Day
|
|
|
|
Within a minimum of two (2) days, the following should be true:
|
|
|
|
1. Torrents should be setup. All files can be synced with the seed box(es) but
|
|
not yet published. The data should be verified using sha256sum and compared to
|
|
the CHECKSUM files provided with the files.
|
|
|
|
2. Website should be ready (typically with an open PR in github). The content
|
|
should be verified that the design and content are correct and finalized.
|
|
|
|
3. Enough mirrors should be setup. This essentially means that all content for
|
|
a release should be synced to our primary mirror with the executable bit turned
|
|
off, and the content should also be hard linked. In theory, mirror manager can
|
|
be queried to verify if mirrors are or appear to be in sync.
|
|
|
|
## Notes about Patch Days
|
|
|
|
Within a minimum of one (1) to two (2) days, the following should be true:
|
|
|
|
1. Updates should be completed in the build system, and verified in staging.
|
|
|
|
2. Updates should be sent to production and file lists updated to allow mirrors
|
|
to sync.
|
|
|
|
## Prior to Release Day notes
|
|
|
|
Ensure the SIG/Core Checklist is read thoroughly and executed as listed.
|
|
|
|
## Release Day
|
|
|
|
### Priorities
|
|
|
|
During release day, these should be verified/completed in order:
|
|
|
|
1. Website - The primary website and user landing at rockylinux.org should allow
|
|
the user to efficiently click through to a download link of an ISO, image, or
|
|
torrent. It must be kept up.
|
|
|
|
2. Torrent - The seed box(es) should be primed and ready to go for users
|
|
downloading via torrent.
|
|
|
|
3. Release Notes & Documentation - The release notes are often on the same
|
|
website as the documentation. The main website and where applicable in the docs
|
|
should refer to the Release Notes of Rocky Linux.
|
|
|
|
4. Wiki - If applicable, the necessary changes and resources should be available
|
|
for a release. In particular, if a major release has new repos, changed repo names,
|
|
this should be documented.
|
|
|
|
5. Everything else!
|
|
|
|
## Resources
|
|
|
|
## SIG/Core Checklist
|
|
|
|
### Beta
|
|
|
|
* Compose Completed
|
|
* Repoclosure must be checked and pass
|
|
* Lorax Run
|
|
* ISO's are built
|
|
* Cloud Images built
|
|
* Live Images built
|
|
* Compose Synced to Staging
|
|
* AWS/Azure Images in Marketplace
|
|
* Vagrant Images
|
|
* Container Images
|
|
* Mirror Manager
|
|
|
|
* Ready to Migrate from previous beta release (rltype=beta)
|
|
* Boot image install migration from previous beta release
|
|
|
|
* Pass image to Testing Team for final validation
|
|
|
|
### Release Candidate
|
|
|
|
* Compose Completed
|
|
* Repoclosure must be checked and pass
|
|
* Lorax Run
|
|
* ISO's are built
|
|
* Cloud Images built
|
|
* Live Images built
|
|
* Compose Synced to Staging
|
|
* AWS/Azure Images in Marketplace
|
|
* Vagrant Images
|
|
* Container Images
|
|
* Mirror Manager
|
|
|
|
* Ready to Migrate from previous release
|
|
* Boot image install migration from previous release
|
|
|
|
* Pass image to Testing Team for validation
|
|
|
|
### Final
|
|
|
|
* Compose Completed
|
|
* Repoclosure must be checked and pass
|
|
* Lorax Run
|
|
* ISO's are built
|
|
* Cloud Images built
|
|
* Live Images built
|
|
* Compose Synced to Staging
|
|
* AWS/Azure Images in Marketplace
|
|
* Vagrant Images
|
|
* Container Images
|
|
* Mirror Manager
|
|
|
|
* Ready to Migrate from previous release
|
|
* Boot image install migration from previous release
|
|
|
|
* Pass image to Testing Team for final validation
|
|
* Sync to Production
|
|
* Sync to Europe Mirror if applicable
|
|
* Hardlink Run
|
|
* Bitflip after 24-48 Hours
|
|
|
|
{% include "resources_bottom.md" %}
|